Module 02 - Exclusion Library

Lead-letter draft on Thursday morning, pulling from MEP's own past wording.

Recurring exclusions grouped by trade and by commercial. Every suggested line carries the past proposals it came from.

Artifact ready Thu 11am Builds on top of the triage and vendor work earlier in the morning.

What it reads

MEP's archive of past lead letters and quote packages. Surfaces the exclusion lines that recur and groups them by trade (HVAC, plumbing, balancing, controls, insulation) and by commercial (HST, permits, scope-boundary).

On screen

A draft lead letter, exclusions pre-loaded by trade.

Each line shows the past proposals it came from. Click through to read the original wording in context.

Draft - Lead Letter Exclusions

HVAC trade
Duct insulation outside mechanical room. Very common in MEP lead letters
RTU curbs and structural support. Common in MEP lead letters
Final air balancing report by others. Recurring in MEP lead letters
Plumbing trade
Storm and sanitary site connections beyond 1.5m of building. Common in MEP lead letters
Trap primers where not shown on drawings. Recurring in MEP lead letters
Balancing / Controls trade
BAS programming by controls vendor under separate contract. Common in MEP lead letters
Re-balancing after tenant fit-out. Recurring in MEP lead letters
Commercial commercial
HST not included in quoted price. Very common in MEP lead letters
Permits and permit fees by general contractor. Very common in MEP lead letters
Scope strictly per drawings and spec; clarifications listed above. Very common in MEP lead letters

What stays manual

Final wording.

Nothing leaves the estimator's screen without sign-off. Suggestions are loaded; the language that goes to the client is chosen by hand.